BMPs
work! Stormwater runoff from the LID subdivision was much lower than
from the traditional subdivision during construction. And, BMPs continued
to work! After construction, stormwater runoff was unchanged
from pre-development levels.
Non-Technical Results(general findings)
Learn more about what happened in the traditional and LID
subdivision both during construction and post-construction.